(Illustration by Gaich Muramatsu)
If I replicate my volumes over two or three machines, and the machines which acts as the SCM dies of such a bad death that I don't want to re-create it, can I make one of the other server into the SCM easily ? My other thinking here beyond death of the server, is upgrade, I like to move my "main server" between two physical machine, so I can upgrade the "second one", and if the upgrade works, I transform it into the primary machine, and eventually shutdown the other one until I go through the same procedure the other way around. If I use my main server as the SCM, I will have to transfer that function too. Thanks. -- Yves. http://www.SollerS.caReceived on 2008-07-02 00:57:25